Walnut Creek Linear Trail Updates
IN PROGRESS: PHASE 3B (Cannon/Carlin intersection to Oliver Nature Park)
- Construction documents are in the final phases of design. After permitting and review, the project should get underway this winter.
- Widen sidewalks and create safe crossings for trail along Cannon and Matlock Roads to the Oliver Nature Park entrance
IN PROGRESS: 4A (Town Park to Mans Best Field Dog Park)
- Construction completed in Spring 2022 on the paved, 12-ft wide trail connecting the existing trail at Town Park under the Main St./157 Bridge heading west
- Will connect to future 4A expansion to Mans Best Field Dog Park; planning underway on those segments
COMPLETE: 3A (McKnight Park East to Cannon/Carlin Roads)
- Construction began February 2021, completed December 2021
- One-mile paved, 12-ft wide trail from the rear of McKnight Park East, around the Shops at Broad development to connect with existing sidewalks at Cannon and Carlin Roads
Walnut Creek Linear Trail Segments
PHASE 1
- Town Park to James McKnight Park East Passes through Katherine Rose Memorial Park, Hardy Allmon Soccer Complex and James McKnight Park West
- OPEN/Completed 2007
PHASE 2A
- Matlock Road to Phase 2B Paved path around Elmer W. Oliver Nature Park for bike traffic
PHASE 2B
- Oliver Nature Park rear loop to 360 Tollway access road Passes through Philip Thompson Soccer Complex
- OPEN/Completed 2020
PHASE 2C
- 360 Tollway to eastern city limits
PHASE 3A
- James McKnight Park East to Cannon/Carlin intersection
- OPEN/Completed December 2021
PHASE 3B
- Widened sidewalks and safe crossings from Cannon/Carlin intersection to Oliver Nature Park
PHASE 4A
- Town Park to Mans Best Field Dog park
PHASE 4B
- 4A to western city limits