General Requirements All Permits

 •    Permit fees must be submitted with the Permit Application. 

•    Required plans should be folded not rolled.

•    No installation or modification of a fire protection system shall begin until a permit has been issued by the Fire Marshal or prior approval from the Fire Marshal.  See 2018 International Fire Code, Section 901.2. 

 •    Issued Permits shall be kept on the designated premises at all times and shall be available upon request of a Fire Official. See 2018 International Fire Code, Section 105.1.1 and 105.3.5. 

 •    Projects that require a third-party review by a Fire Protection Engineer licensed in the state of Texas, are:  

  1.  New installation of a fire protection system 
  2.  Modification of more than 5 devices in a fire protection system 
  3.  Any system so designated by the Fire Marshal 

Submit the third party review with the permit application. You may contact Scott Lingo with questions about your project,   Email Scott Lingo or 817-276-4770.