This permit required for all work within public R.O.W. and or public utility easements that contain City of Mansfield utilities. Permit application must be submitted at least one week prior to construction start date. Construction plans shall be standard sheet sizes only (Letter, Legal, Tabloid). The City of Mansfield Utility Department (water/wastewater only) is part of Texas811 (dial 811). It is the responsibility of the contractor to obtain and verify locates have been completed prior to excavation and to have them remarked should the markings fade or disappear. FOR TRAFFIC SIGNAL LOCATES please email Mansfield Traffic Operations at trafficsignallocates@mansfieldtexas.gov
By checking the "I agree" box below, you agree and acknowledge that
This field is not part of the form submission.
* indicates a required field